Move the data.
Prove the match.

Your estate moves in sequenced waves, and each wave is proved against its source before cutover.

  • Sequenced waves

    Dependencies are mapped, and every wave has a cutover and rollback plan.

  • Proved at four levels

    Schema, row, checksum and cell are compared before a wave is accepted.

  • Evidence you keep

    Reports you can audit, even for a move another firm runs.

Pilot in four to six weeks, typically · Fixed price · The evidence is yours

SourceTargetSigned

A signed migration,
not just a finished copy.

Finished copySourceTargetSigned migrationSourceTargetJob doneCounts agreeTotals differExplainedSigned

A pipeline can finish while a business total changes underneath it. Counts can agree while values differ.

  • Reconciled every wave

    Comparison is part of each wave, not a check at the end.

  • Accepted on evidence

    Cutover rests on reports your team can inspect, not on a job status.

  • Same line, every wave

    A Pilot proves the path in one slice; later waves repeat it.

This is the right engagement when

  • A funded migration needs a wave plan and a way to accept each wave.
  • The move is under way, and the evidence is incomplete.
  • Another team runs the move, and you need an independent check before sign-off.

Move in waves.
Accept on evidence.

Every wave runs the same four steps, and none goes live without evidence.

SequenceMoveReconcileSign offWay backSourceTargetSchemaRowChecksumCellCutover recordNext wave
  1. We map source dependencies into waves and set the cutover and rollback path before the first slice moves.

    You receive

    Wave and rollback plan

    The waves in order, each with its way back.

What this is not.

This service moves the data and proves it, and it ends when the evidence for each wave is signed.

The story this service stands on.

Rows of parked semi-trucks and trailers in a wet freight yard at dusk, under floodlights

FleetEnergies

Fleet & Logistics

Lower fleet carbon emissions
40%
Lower operating cost
28%

FleetEnergies on Microsoft Fabric: Real-Time Fleet Telemetry, 40% Less Carbon

FleetEnergies ran fleet intelligence on 300+ fragmented on-premise databases, and reports took hours. We migrated all of them, 50 TB in all, onto Microsoft Fabric at 100% data integrity and added a real-time EventStream to EventHouse path. Operating cost fell 28%, and fleet carbon emissions fell 40%.

Explore Fleet & Logistics

Questions buyers ask.

What is data reconciliation in a migration?

Data reconciliation compares the migrated target with its source and explains every difference before the target is accepted. We compare at four levels, schema, row counts, checksums and individual cells, because counts can agree while values differ. Acceptance then rests on evidence reports your team can inspect, not on the status of the copy job.

Can you audit a migration another firm is running?

Yes. Migration Recon compares source and target and issues the evidence reports even when another delivery team owns the move. That is useful when a migration is under way and the evidence is incomplete, or when you need an independent check before sign-off. The duration of a standalone audit is scoped to the move in the first working session.

How long does a migration wave take?

The first wave runs as a Pilot that typically takes four to six weeks, at a fixed price, and proves the production path in one bounded slice. It follows an Assess of typically two weeks and a Blueprint phase of typically two to three weeks. Later waves repeat the same line on a quarterly rhythm, and each one goes live only on signed evidence.

What happens if a migration wave fails reconciliation?

The wave does not go live until every mismatch is investigated and explained. Every wave has a cutover and rollback plan set before the first slice moves, and source and target both stay available for comparison. Cutover is authorized by the evidence and the agreed conditions, so a failed check sends the wave back for investigation instead of into production.

What do we keep from a migration engagement?

You keep the wave plan, the cutover and rollback plans, and the reconciliation evidence reports for every in-scope wave. The evidence records what was compared and what each difference turned out to be, so it supports source retirement and any later audit. It belongs to you, so it stays useful whoever operates the estate after cutover.

More in Modernization.

All of Modernization

Natural next step

Natural next step: Run, Data & AI

After reconciliation is signed, put the new estate to work in an operating workload.

  • SourceToolingTarget

    Target Mapping

    Every source component gets its target service, tooling lane and disposition, in a source-to-target map you keep.

  • BronzeSilverGold

    Data Infrastructure

    The governed target is ready before the first wave lands: medallion layers, workspaces, environments, access and validation.

  • RetireRedesignConvert

    Platform Modernization

    Legacy mappings and report logic are converted where it is safe and redesigned where it is not. You keep the conversion inventory and retirement plan.

  • Left behindLift and shiftSized

    Cost Optimization

    Cost is engineered into the move: what to retire, a measured target size and a cost case for each wave.

Bring the move
you need to sign off.

Bring your migration, or one already under way, to a 30-minute working session.