Land every migrating workload
on a target chosen for it.

Every source component gets its target service, its disposition and its tooling lane, before the first wave is planned.

  • A target for every part

    Each component lands on the Fabric or Databricks service that suits its job.

  • A clear disposition

    Retire, carry over, convert or redesign, decided component by component.

  • A lane for the work

    Each conversion path is set, so the waves can be sized and priced.

Scoped in the first working session · Fixed price · The map is yours

SourceToolingTarget

Every workload on the right service,
not a one-for-one copy.

SourceTargetOne for oneMappedMapRetired

A platform name does not tell the team where each workload belongs. A one-for-one translation carries the old limits into the new estate.

  • Read in context

    Dependencies, latency, access and volume decide the target, not the source system.

  • Retired before it moves

    Workloads with no continuing purpose are dropped before they cost conversion effort.

  • One map for the waves

    The wave plan is sized and priced from the source-to-target map.

This is the right engagement when

  • The platform is agreed and the move is funded.
  • The waves need component-level targets before they are sequenced.
  • A direct translation would carry dead workloads into the new estate.

One source inventory.
Explicit targets throughout.

Four steps turn the source inventory into a map the migration team can work from.

InventoryTarget serviceDispositionTooling laneLakehouseWarehouseReal-timeTooledBy handCarry overConvertRedesignRetireRedesignConvertCarry over
  1. We group source databases, pipelines, report models and serving workloads by dependency and operating need.

    You receive

    Source inventory

    Every in-scope component, with its dependencies and requirements.

What this is not.

This service maps a move whose platform is already chosen, and it ends when every component has a target.

The story this service stands on.

Rows of spinning machines in a textile mill, white fibre threads catching the early light

Grasim Industries · Aditya Birla Group

Manufacturing · Textile

Inspection time per batch
4 hrs → 1 min
Defect-detection accuracy
98%

Grasim Checks Fibre Quality in One Minute, Not Four Hours

Grasim moved fibre inspection from technicians reviewing images by hand to an automated pipeline, and each stage landed on a service chosen for its job. OneLake holds about 10,000 images a day as the single image repository. A deep-learning model built in Azure AI Vision Studio classifies them, and Fabric Real-Time Analytics, an EventHouse store with Data Activator, flags any image below the quality threshold as soon as it is scored.

Power BI gives the plant-wide view of quality, and the pipeline is served on Azure Kubernetes Service under Microsoft Cloud Adoption Framework governance.

Explore Manufacturing

Questions buyers ask.

What is a source-to-target map in a data migration?

A source-to-target map records, for every source component, the target service it lands on, its disposition and the tooling lane that moves it. The dispositions are retire, carry over, convert or redesign. The map is the contract for the wave plan: the waves are sized and priced from it, and it shows which work is repeatable and which needs engineering judgment before conversion starts.

How is target mapping different from choosing a platform?

This work starts after the platform is chosen. Choosing between platforms is Technology Selection in Strategy & Advisory. Here the platform is agreed and the move is funded, and the question is where each component belongs on it: which extraction job, warehouse table, semantic model or low-latency query lands on which Fabric or Databricks service, and why that service fits its job.

Why not translate every workload one-for-one onto the new platform?

A one-for-one translation carries the old limits, and the dead workloads, into the new estate. An extraction job, a warehouse table, a semantic model and a low-latency query do not belong on the same service just because they share a source system. We read each component for its dependencies, latency, access and volume, and retire anything with no continuing purpose before it costs conversion effort.

How long does component mapping take, and what do we keep?

The duration is scoped in the first working session, because it depends on the size of the source inventory, and the price is fixed once it is scoped. You keep the source-to-target map, with a target service and disposition for every in-scope component, and the tooling and dependency plan that feeds the migration wave plan, whoever runs the waves.

What do we need before component mapping starts?

You need an agreed platform, a funded move and a source inventory to work from. If the platform is still open, start with Technology Selection in Strategy & Advisory. The first step reads that inventory and groups the source databases, pipelines, report models and serving workloads by dependency and operating need, so the map starts from how the estate actually fits together.

More in Modernization.

All of Modernization

Natural next step

Natural next step: Data Infrastructure, Modernization

With targets mapped, prepare the estate they will land in.

  • BronzeSilverGold

    Data Infrastructure

    The governed target is ready before the first wave lands: medallion layers, workspaces, environments, access and validation.

  • RetireRedesignConvert

    Platform Modernization

    Legacy mappings and report logic are converted where it is safe and redesigned where it is not. You keep the conversion inventory and retirement plan.

  • SourceTargetSigned

    Migrations

    Data moves in waves, and Migration Recon proves each one matches. You keep the evidence reports, cutover plan and rollback plan.

  • Left behindLift and shiftSized

    Cost Optimization

    Cost is engineered into the move: what to retire, a measured target size and a cost case for each wave.

Bring the source inventory.
Make the target concrete.

Bring your source inventory to a 30-minute working session and leave knowing which component choices are still open.